{ Construction in the kitchen }


Frames are being built to insulate and hang drywall.
Also, installed a new plywood sub-floor. Now it is level and ready for tile.


Ceiling beams reinforced.
Plywood floor. It's level now.



Kitchen with new drywall- after the final sanding.
A new kitchen door was installed.

Here is the other side of the kitchen after the drywall installation.
So much dust!