{ Master bathroom: rehab photos 2009 to 2014 }

BEFORE:
Before- the potty throne
Before
Before
Before
gutted bathroom (2010)
gutted bathroom 2010
gutted bathroom 2010
______________________________________________

AFTER:
Tiles were purchased in 2009, the bathroom rehab started in 2010, and the final coat of paint went on the walls in February 2014.
We went with white subway tile in the shower and bath, and white hexagon floor tile.


Fortunately, we were able to reuse the original base cabinet and mirror.  The cabinet just needed a new sink,  a faucet and new door handles. 

The current bathtub is temporary, until we find an antique clawfoot tub to replace it.   Low priority.

Shower
Hexagon tile


After (with temporary curtains)-
 Thinking about shutters for privacy, and cabinets on each side of the window.

View from the master bathroom- 
The Bloomindale Trail entrance is behind the houses.